Click here for more

Great Lakes & Seaway Shipping Online Click here for live Webcam

Click here for live Weather Data from Vantage Point

Live Radio Scanner from Vantage Point
 

Vantage Point
(St Clair River at the Black River in Port Huron)

By Frank Frisk, Barry Hiscocks, Philip Nash and Angie Williams*
 

Vessel Name Direction Location Time Vantage Point ETA Destination Cargo Comments Added
Paul R Tregurtha (update 4)  Upbound  Stag Island  13:30  14:05  Sturgeon Bay WI  ballast  corrected river time no fuel stop  1/7/2009 1:31:19 PM 
Paul R Tregurtha  Upbound  St. Clair Power Station - Recor  12:40  14:25  Sturgeon Bay WI  ballast  preparing to depart St Clair Detroit Edison Power Facility proceeding upbpound to sturgeon bay for winter lay-up  1/7/2009 12:23:30 PM 
Atlantic Huron  Downbound  30 mn. above Lights 11 & 12  09:22  10:34    coal  Duluth load  1/7/2009 9:12:20 AM 
Algoway  Downbound  30 mn. above Lights 11 & 12  08:05    Sarnia Harbor    scheduled for lay up  1/7/2009 7:05:33 AM 
Canadian Enterprise  Downbound  30 mn. above Lights 11 & 12  07:25  08:37        1/7/2009 7:04:33 AM 
Peter R Cresswell  Downbound  Vantage Point  02:54  02:54  Sarnia, Ontario  In ballast  Turning off Black River and heading to the North Slip in Sarnia for winter lay-up.  1/7/2009 3:04:00 AM 
Paul R Tregurtha (revised)2  Upbound  St. Clair Power Station - Recor  22:00      coal  arrived at dock upon completion of discharge proceeds to Sturgeon Bay for winter lay-up  1/6/2009 10:12:40 PM 
John D Leitch  Downbound  Lights 7 & 8  21:05  21:35    coal    1/6/2009 9:13:00 PM 
Rt. Hon. Paul J. Martin--update  Upbound  Imperial Fuel Dock  20:06    Duluth,MN.  in ballast  Arrived at Imperial Oil fuel stand in Sarnia,ON. ETD is 22:36  1/6/2009 8:13:12 PM 
Paul R. Tregurtha  Downbound  Lights 7 & 8  19:20  19:54  St. Clair,MI.  coal  due to unload at Detroit Edison Recors Power Plant  1/6/2009 7:22:04 PM 
Saginaw  Downbound  Sarnia  18:59  19:00  Toledo, OH.    Grain cargo from Thunder Bay,ON. Transit time may change downbound due to ice conditions in Lake St. Clair  1/6/2009 7:16:12 PM 
Rt. Hon. Paul J. Martin  Upbound  Grassy Island  13:28  19:18  Duluth, MN  In ballast  Will load taconite at DM&IR.  1/6/2009 1:29:30 PM 
Paul R Tregurtha  Downbound  Alpena  11:00  21:00  Recor Power Plant  coal  scheduled time for docking is 22:00 weather on the lake may alter timing data this is her last load of the season next port sturgeon bay for lay up  1/6/2009 10:50:27 AM 
John B Aird  Downbound  30 mn. above Lights 11 & 12  09:00  10:12  Nanticoke ON  coal    1/6/2009 9:14:30 AM 
Peter R Cresswell (update)  Downbound  30 mn. above Lights 11 & 12  18:15    Sarnia Harbor  ballast  completed clean out of cargo holds in Lake Huron proceeding down to Sarnia Harbor for winter lay-up  1/6/2009 4:58:15 AM 
Peter R. Cresswell  Upbound  Sterling Fuel  17:41  23:11  Sarnia, ON  In ballast  Bound for the North Slip for winter layup.  1/5/2009 5:42:57 PM 
American Mariner  Downbound  Lights 7 & 8  14:52  15:22        1/5/2009 2:53:21 PM 
Kaministiqua (revised)  Upbound  Imperial Fuel Dock  15:00  15:10  Thunder Bay  ballast  scheduled to load grain and goto lay-up with storage fuel dock service may alter timing data  1/5/2009 1:03:40 PM 
Kaministiqua  Downbound  Sarnia  12:14  12:24  Imperial Fuel Dock  ballast  going to fuel dock prior to heading for thunder bay  1/5/2009 11:54:52 AM 
Herbert C Jackson  Downbound  30 mn. above Lights 11 & 12  19:55  21:07  Toledo OH  taconite  marquette load next port detroit to lay-up  1/4/2009 7:17:42 PM 
Mississagi  Downbound  Alpena  17:45  03:05      travel time may be altered by lake travel weather conditions  1/4/2009 5:19:36 PM 
Csl Assiniboine  Upbound  Detroit River Light  10:10  17:35  Duluth MN    stop possible  1/4/2009 9:39:09 AM 
Kaministiqua  Upbound  Sarnia  16:30    lay up    reported into sarnia harbor for winter lay up scheduled trip to thunder bay cancelled  1/3/2009 7:01:34 PM 
Kaministiqua  Upbound  Belle Isle  11:47  16:32  Thunder Bay  ballast  scheduled to load grain possible fuel stop ?  1/3/2009 11:21:55 AM 
Manistee (update)  Downbound  Sarnia  08:30    layup  ballast  laid up for the winter  1/3/2009 8:52:09 AM 
Manistee  Downbound  30 mn. above Lights 11 & 12  06:40  07:52        1/3/2009 5:37:49 AM 
Agawa Canyon  Upbound  Imperial Fuel Dock  02:28  02:34  Goderich, Ontario  In ballast    1/3/2009 2:29:36 AM 
Algosteel (Revised)  Upbound  Light X32  22:10    Lake Michigan Port  salt  Will be stopping for fuel at Imperial Oil after the Agawa Canyon clears.  1/2/2009 10:59:45 PM 
Agawa Canyon (Revised)  Upbound  Salt Dock  22:43    Goderich, Ontario  In ballast  Stopping at Imperial Oil in Sarnia for fuel.  1/2/2009 10:56:58 PM 
Algosteel  Upbound  Rouge River  19:28  01:00  Lake Michigan Port  salt  Loaded and departed Ojibway Salt dock in Windsor, Ontario.  1/2/2009 7:32:21 PM 
Agawa Canyon  Upbound  Ambassador Bridge  18:50  23:45  Goderich, Ontario  In ballast    1/2/2009 6:56:29 PM 
Tug Invincible/Barge McKee Sons  Downbound  Vantage Point  18:15  18:15  Detroit, Michigan    Vantage Point time was approximate.  1/2/2009 6:51:47 PM 
Saginaw  Upbound  Vantage Point  02:16  02:16  Sault Ste. Marie, Ontario  coal    1/1/2009 2:18:10 AM 
Arthur M Anderson  Upbound  Lights 7 & 8  02:10    Two Harbors, MN  In ballast    1/1/2009 2:17:06 AM 
American Integrity  Downbound  Lights 7 & 8  01:00  01:30        1/1/2009 1:25:23 AM 
American Integrity (revised)2  Upbound  Lights 7 & 8  17:00  17:30  Upper Lake Huron Port  ballast    12/31/2008 5:44:11 PM 
American Integrity (revised)  Upbound  Lights 7 & 8  14:00    Anchorage  ballast  stopping,weather,good time to catch up on prep for winter lay-up no ETD stated  12/31/2008 2:08:19 PM 
Herbert C Jackson  Downbound  Alpena  13:45  22:00  severstal steel  taconite  lake travel weather conditions may alter timing data nor wind warnings posted  12/31/2008 1:45:44 PM 
American Integrity  Upbound  Stag Island  11:00  11:35  Upper Lakes Port  ballast    12/31/2008 11:02:40 AM 
John D Leitch  Upbound  Livingstone Channel  09:10  15:30  Superior WI  ballast  fuel stop possible scheduled to load coal at MWE  12/31/2008 9:07:31 AM 
KAMINISTIQUA  Downbound  30 mn. above Lights 11 & 12  07:50  09:02  Windsor ON  canola seed  thunder bay 12 29 load  12/31/2008 8:03:04 AM 
Paul R Tregurtha  Upbound  Stag Island  16:55  17:30  Superior WI  ballast    12/30/2008 6:05:04 PM 
Canadian Olympic  Upbound  Downtown Detroit  16:25    Courtright, ON  Coal  Loaded in Ashtabula, OH for the Lambton Generating Station. Refueled at Sterling Marine Fuels.  12/30/2008 4:26:36 PM 
American Integrity (revised)2  Downbound  Lights 7 & 8  11:15    Anchorage  coal  gone to anchor awaiting open coal dock in st clair  12/30/2008 11:08:26 AM 
Algomarine  Upbound  Lights 7 & 8  10:30    Goderich ON    Departed anchorage scheduled to load salt for green bay lost her anchor on departure shelly marine has been dispatched to retreive anchor  12/30/2008 10:24:16 AM 
American Integrity (revised)  Downbound  30 mn. above Lights 11 & 12  10:25  11:37  Recor Power Plant  coal  checking back due to the PRT at the dock still discharging  12/30/2008 10:10:02 AM 
Canadian Enterprise  Upbound  Downtown Detroit  9:30  14:25  Superior, WI  In ballast  Will load coal at the SMET.  12/30/2008 9:37:24 AM 
American Integrity  Downbound  30 mn. above Lights 11 & 12  09:20  10:32  Recor Power Plant DTE  coal    12/30/2008 8:43:33 AM 
Philip R. Clarke  Upbound  Grassy Island  15:37  21:27  Green Bay, WI  Coal  Loaded in Sandusky, OH.  12/29/2008 3:59:08 PM 
Tug Rebecca Lynn/A410  Upbound  Stag Island  13:20  13:55      may stop heavy wind warnings posted this afternoon 1400 2400  12/29/2008 1:10:39 PM 

Refresh  


Click here for information on the ships you see passing


*Additional trip details may be provided by the other Boatnerd.com Vessel Passage sections by Andy Hering,
 Matt Miner, and Tom Stewart
**Notes time due is for the following day
List based on volunteer observations, may not contain all passage information

Scripting by Artisson.Net