Click on image for a full screen view

Algoma Central CEO Greg Wight, The Honourable H.N.R. Jackman, Aba Sergio, Jacqueline Latimer, Radcliffe Latimer, Ship Chief Engineer Kaz Mankiewicz, Captain Clarence Vauther  stand in front of the renamed vessel following a ceremony in Port Colborne October 4, 2012.

Radcliffe R. Latimer
(Algobay 1978 - 1994, Atlantic Trader 1994 - 1997)

by George Wharton

In 1977, various Canadian fleets including Sault Ste. Marie, Ontario's Algoma Central Corp. were requested to bid on the movement of western coal for Ontario Hydro.  Algoma responded quickly to the request also realizing that they would need another self-unloader to handle the extra loads.  Algoma's proposal was presented to Ontario Hydro by early March of 1977 knowing they held an option for hull # 213 at Collingwood Shipyards that was due to expire on March 11, hoping for but not expecting a quick response to their proposal.  Even though Canada's ship building industry was booming with competition for building berths, Algoma chose to defer its decision on hull # 213 until it received a decision from Ontario Hydro.  Later that month, Algoma was awarded a 15 year contract with Ontario Hydro to move 1 million metric tons of coal per year beginning in 1978.  Algoma's option at Collingwood was extended and renumbered  as hull # 215 and by the end of March, 1977, a contract had been signed for the building of a new self-unloader.  The contract was worth $26,138,000 less a 20% federal government shipbuilder's subsidy (which had just been raised from 17%).  Of note, hull # 213 defaulted to Canada Steamship Lines who also held the option on Hull # 214, both scheduled to be new self-unloaders.  As history unfolded, both contracts were postponed.  When CSL made the decision was made to proceed with the buildings, they were assigned new hull numbers by the shipyard, becoming hull # 222 (Atlantic Superior) and hull # 225 (Hon. Paul Martin now sailing as the Atlantic Erie). 

As a result, the keel was laid for Collingwood Shipyard's hull # 215 on August 16, 1977.  Hull # 215, a new self-unloading bulk carrier, was built in 1978 for Algoma Central Corp., Sault Ste. Marie, ON.  The new carrier was launched on June 19, 1978 and was christened Algobay by Mrs. Cedric Ritchie, wife of the chairman and president of the Bank Of Nova Scotia on that date at a ceremony at the shipyard.  The Algobay was built to a "Nova Scotia Class" classification allowing for the operation of the vessel along the eastern seaboard.  The new vessel had an advanced "V" shaped bow to the 24' (7.32m) mark for working in ice, higher horsepower diesels and a greater degree of hull strengthening.  The self-unloader was the widest vessel built to date at the shipyard.  The Algobay's name was derived from the common corporate naming prefix "Algo" and "bay" honoring the various bays of the Great Lakes but no one in particular.

The overall dimensions of the Algobay as originally built were 730' 00" (222.50m) loa x 75' 10" (23.13m) beam x 46' 06" (14.17m) depth.  The vessel was originally powered by 2 Pielstick 10PC2-3V-400 V-10 cylinder 5,350 b.h.p. (3,935 kw) diesel engines built by Crossley Premier Engines Ltd., Manchester, UK burning intermediate grade 40 fuel.  The power drove a single controllable pitch propeller giving her a rated service speed of 13.8 m.p.h.  Her original machinery also included a KaMeWa 1,000 h.p. (746 kw) bow thruster.  Serviced by 22 hatches, the vessel's 5 holds were capable of carrying 33,840 tons (34,381 mt) at a mid-summer draft of 32' 08" (9.958m) and approximately 25,945 tons (26,362 mt) at the Seaway draft of 26' 06" (8.08m). These holds had the cubic capacity to handle 30,200 net tons (equivalent to 26,964 tons or 27,397 mt) of coal.  Other capacities included 447 tons (454 mt) of fuel oil, 254 tons (258 mt) of diesel oil, 112 tons (114 mt) of potable water and 16,464 tons (16,728 mt) of water ballast.  The Algobay displaced 9,050 tons (9,198 mt) lightweight.  The self-unloading equipment consisted of a variable speed 3-belt gravity system with bulk flow gates, plastic linings and vibrators throughout feeding to a single loop belt elevator and a stern-mounted 261' (79.55m) discharge boom that can swing 90 degrees to port or starboard and can discharge at a rate of up to 5,354 tons (5,440 mt) per hour.

The Algobay sailed on her maiden voyage leaving Collingwood on October 26, 1978 in ballast to Stoneport, MI to load limestone for Sarnia, ON.  On November 14, 1978; as the Algobay was leaving Sept Isles, QC for Sydney, NS with a load of iron ore, she was in collision with the 90,000 ton 832' 06" (253.75m) Italian registered ore carrier Cielo Bianco. The tug Pointe Marguerite, which was towing the Cielo Bianco at the time, was crushed between the 2 larger vessels and sunk with the loss of 2 lives.  The Algobay then proceeded to Ashtabula, OH for a partial unload and on to Port Arthur Shipbuilding, Thunder Bay, ON for repairs.  Late the following year, on December 2, 1979, the self-unloader grounded at Crossover Island on the St. Lawrence River west of Brockville, ON when the steering gear failed.  She was pushed out of the shipping channel by a USCG tug but was not freed from her strand until December 4 with the assistance of tugs Robinson Bay, Helen McAllister and Salvage Monarch.  There was no damage other than the necessary repairs to the steering gear.

The Algobay was involved in a head-on collision with the Upper Lakes steamer Montrealais on an extremely foggy St. Clair River just below Port Huron, MI on June 25, 1980 with resulting extensive bow damage to both vessels.  The Algobay's approximately $500,000 worth of damage was repaired at Fraser & Associates, Port Colborne, ON.  Damage to the Montrealais exceeded $1.5 million.  After being repaired, on September 10, 1980, the Algobay is noted to have loaded the 400 billionth ton of iron ore at Sept Isles, QC and on April 5, 1982 was the honored vessel officially opening the Welland Canal for that season.  On May 16, 1983 after unloading at Halifax, NS, the Algobay proceeded to Saint John, NB to load 33,000 tons (33,530 mt) of salt for Montreal, the first load of a 6 year contract.

The Algobay was upgraded at Port Weller Dry Docks, St. Catharines, ON to "Caribbean Class" during the winter of 1987/1988 thus allowing her to trade on deep sea Atlantic Ocean and Gulf of Mexico routes.  In the summer of 1989, the versatile carrier was noted to have rescued 2 people from dinghy in the Florida Straits.  Then, on February 5, 1990, the Algobay was reflagged Liberian at Shelbourne, NS being manned by Canadian senior officers and Filipino junior officers and unlicensed crew.  The vessel was chartered for a 2 year period to Atlantic Beltships, a partnership of Jebsens Thun Beltships Investments Ltd. and A.C.C. Shipping (Barbados) Ltd., all of Bridgetown, Barbados.  Both A.C.C. Shipping and Atlantic Beltships were subsidiaries of Algoma Central Corp. and were part of the Algoma Central Marine Group.

The Algobay was chartered by Canada Steamship Lines in 1994 and was renamed Atlantic Trader that year.  As part of her new duties, the Atlantic Trader delivered the first cargo of coal from Ashtabula, OH to New Brunswick Power at Belledune, NB.  Other coal cargoes were delivered to Hamilton, Courtright and Nanticoke, ON as well as iron ore to Hamilton and Nanticoke and grain to Halifax.  The self-unloader came off charter in 1997 and regained her original name of Algobay upon her return to the Algoma fleet.  While under charter, on October 6, 1995, the vessel was returned to Canadian registry

With her return to the Algoma fleet, the Algobay sailed under the management of Seaway Self Unloaders, St. Catharines, ON (a partnership of Algoma Central and Upper Lakes Group).  At the beginning of the new century, the partnership became Seaway Marine Transport who now operate and manage both the Algoma and Upper Lakes fleets of bulkers and self-unloaders.  On June 9, 1999 while exiting the Poe Lock at the Soo, the unloading boom having been raised to correct a slight port list, swung out of control knocking down 5 light standards.  Extensive damage resulted to the hydraulic slewing system with the boom itself receiving some structural damage.

The Algobay entered long term lay-up on December 25, 2002 at Toronto, ON, the hull reportedly requiring extensive steelwork and equipment upgrades.  Then, on November 7, 2007, Algoma in conjunction with Upper Lakes Shipping announced the construction of two new maximum seaway size self-unloading forebodies to attach to the aft-ends of the Algobay and fleet mate Algoport.  The forebodies were built by Chengxi Shipyard, Jiangyin, China at a total cost of approximately $125 million, the cost to be split equally between the 2 companies involved.  Due to the sinking of the Algoport while in transit to China on September 6, 2009, the forebody being built for the Algoport became a complete new-build (new forebody and stern) to be named Canadian Mariner entering service in 2011.

Shortly after the announcement, on November 28, 2007, the Algobay was moved by tugs from Toronto to Pier 10 at Hamilton, ON in preparation for the upcoming overseas tow.  The tow departed Hamilton on May 13, 2008 for Montreal, QC towed by Upper Lakes tug Commodore Straits.  Marcon International, Coupeville, WA was contracted to arrange the towing of the Algobay to Jiangyin, China.  After a short stay in Montreal, the 5,200 b.h.p. (3,824 kw) ocean tug Hellas (606 GRT) operated by Gigilinis Shipping Group, Thessaloniki, Greece departed Montreal on May 25 with the Algobay in tow bound for Gibraltar where, on June 16, the towing duties were transferred to the 8,202 b.h.p. (6,032 kw) ocean tug Simoon (978 GRT) operated by ITC Management, Heemstede, Netherlands.  The Simoon towed the Algobay through the Suez Canal arriving at Jiangyin, China on September 10, 2008.

The new coastal-class self-unloader is now powered by 2 new inline 8-cylinder MaK 8M32C long-stroke diesel engines each rated at 5,221 b.h.p. (3,840 kw) built by Caterpillar Motoren GmbH & Co. KG, Germany.  Capable of burning economical heavy fuel oil (HFO), marine diesel oil (MDO) or diesel oil (DO), these engines feature the ultimate in emission reduction technology and weigh about 46.4 mt each.  The power is fed to a new controllable pitch propeller.  The Algobay's newly designed hull has 6 holds serviced by 22 hatches.  The self-unloading equipment consists of a variable speed 2-belt gravity system with shear type basket gates, UHMW  plastic linings and vibrators throughout feeding to a single loop belt elevator and a stern-mounted 261' (79.55m) discharge boom that can slew to 95 degrees to port or starboard and can discharge at a rate of up to 5,354 tons (5,440 mt) per hour.  The Algobay is also fitted with a new bow thruster and generator sets.  The aft end was rebuilt with new navigation equipment in a modernized wheelhouse and updated crew accommodations.

The Algobay's new forebody was launched with a ceremony held at the Chengxi Shipyard on March 30, 2009 (see video below).  The new Algobay was fresh out of the drydock in China on October 21, 2009.  After crossing the Pacific Ocean and transiting the Panama Canal, the Algobay arrived at Portland, ME in early January, 2010 for a short winter lay-up.  The vessel made several coastal trips before venturing into the Great Lakes.  On February 24, 2010, the Algobay departed Portland for Port Cartier, QC where it departed February 28 with 35,628 tons (36,200 mt) of iron ore for New Orleans, LA.  After discharging the cargo on March 13 into river barges on the Mississippi River for furtherance to the AK Steel facility at Ashland, KY, the Algobay proceeded to Santa Marta, Columbia for a load of 30,510 tons (31,000 mt) of steam coal for Newburg, NY on the Hudson River.  The Algobay's first cargo for the Great Lakes was a load of iron ore from Sept Isles, QC for Toledo, OH, the new self-unloader entering the St. Lawrence Seaway upbound for the first time on April 8, 2010.  The Algobay's first season on the Great Lakes was not without incident.  On April 13, the vessel grounded while upbound the St. Marys River after rounding Johnson's Point and also grounded on a shoal just outside the shipping channel while upbound the St. Lawrence River near Chippewa Bay, NY.  In both cases, the Algobay damage required dry-docking, the repairs being completed at the Seaway Marine and Industrial Inc. facility at Port Weller, ON.  On December 27, 2010, the Algobay departed the St. Lawrence Seaway for Trois-Rivieres, QC to unload wheat and then on to Port Cartier, QC to begin Gulf of St. Lawrence / St. Lawrence River and coastal trading for the winter of 2010/11.

On October 4, 2012, Algobay was renamed Radcliffe R. Latimer to honor a former Algoma Central chairman. Mr. Latimer served as the chairman of Algoma Central Corp. from Jan.15, 2003 and its director since 1982, and served as its corporate director since 1979. He also served as a director of Hydro One Inc. and of Apac Minerals, Inc.


 

Overall Dimensions (metric)
 Length  740' 00" (225.56m)
 Beam  77' 11" (23.74m)
 Depth  49' 03" (15.00m)
 Capacity (mid-summer)  36,668 tons (37,257 mt)
 
at a draft of 33' 04" (10.15m)
 Capacity (Seaway)  26,445 tons (26,870 mt)
 at a draft of 26' 06" (8.08m)
 Cubic Capacity (coal)  33,034 net tons
 Power (diesel)  10,748 b.h.p. (7,903 kw)

 

10-Algobay-11-15-10-jm.jpg (90368 bytes)
At Parrish & Heimbecker, Hamilton, ON,
Nov.15, 2010. John McCreery
1-algobay-12-04-10-pb.jpg (60677 bytes)
Welland Canal above Lock 7, Dec. 4, 2010.
Paul Beesley
3-Algobay-12-5-10-bv.jpg (90321 bytes)
Unloading iron ore at Toledo, OH, Dec. 10, 2010.
Bob Vincent
Speer-Algobay-82410rl.jpg (52336 bytes)
Passing the Edgar B. Speer on the St. Marys River,
Aug. 24, 2010. Roger LeLievre
6_abay_8_25_10_rb.jpg (74756 bytes)
Downbound the St. Clair River by Harsen's Island,
Aug. 25, 2010. Rod Burdick
2-Algobay-08-27-10-mb.jpg (55192 bytes)
Downbound the St. Lawrence River by Brockville, ON,
Aug. 27, 2010. Murray Blancher
9-Algobay-08-16-10-WDB.jpg (83211 bytes)
Upbound the St. Lawrence River, Aug. 16, 2010.
Dave Bessant
14-Algobay-08-16-10-WDB.jpg (80386 bytes)
Detail. Dave Bessant
15-Algobay-08-16-10-WDB.jpg (73361 bytes)
Stern view. Dave Bessant
Algobay-7.10.2010-ah-d.jpg (56952 bytes)
Dry-docking at Seaway Marine & Industrial (Port Weller), July 10, 2010. Al Howard
Algobay-7.10.2010-ah-e.jpg (79754 bytes)
Another view. Al Howard
6-bay-07-11-10-pb.jpg (105415 bytes)
Dry-docked, July 11, 2010. Paul Beesley

Upbound the St. Lawrence River just prior to grounding, July 5, 2010. Larry Breon

Grounded on a shoal just outside the shipping channel, July 5, 2010. Fritz Hager

Another view. Fritz Hager
10-Algobay-06-17-10-WDB.jpg (71232 bytes)
St. Lawrence River near Mariatown, ON,
June 17, 2010. Dave Bessant
13-Algobay-06-17-10-WDB.jpg (50349 bytes)
Stern view. Dave Bessant

Upbound the St. Lawrence River passing Boldt Castle,
July 5, 2010. Larry Breon
CIMG0585.jpg (67893 bytes)
Arriving at Little Narrows (Cape Breton), NS,
May 29, 2010. Dave Yager
CIMG0587.jpg (72424 bytes)
Docking. Dave Yager
CIMG0589.jpg (78453 bytes)
Docked at Little Narrows. Dave Yager
2-Algobay-4-12-10-mrd.jpg (71583 bytes)
Upbound the St. Clair River at Port Huron, MI,
Apr. 12, 2010. Mark Demaline
Algobay_1_2.jpg (66076 bytes)
Upbound St. Marys River at Dark Hole after rounding Johnson's Point, Apr. 13, 2010. Jerry Masson
1-Algobay-4-16-10-TM.jpg (73760 bytes)
Downbound at the Lake Huron cut buoys at Point Edward, ON, Apr. 16, 2010. Terry McCullough

Maumee River, Toledo, OH, Apr. 11, 2010.
Jim Hoffman

Stern view. Jim Hoffman

Starboard view. Jim Hoffman
4-algobay-4-9-10-pb.jpg (61976 bytes)
Upbound the Welland Canal clear of Lock 1,
Apr. 9, 2010. Paul Beesley
9-Algobay-04-10-10-a-bb.jpg (65443 bytes)
At Port Colborne, ON, Apr. 10, 2010.
Bill Bird
12-Algobay-04-10-10-d-bb.jpg (87350 bytes)
Leaving Port Colborne for Toledo, OH,
Apr. 10, 2010. Bill Bird
Algobay4-08-10-b-km1.jpg (99860 bytes)
St. Lawrence Seaway near Montreal, QC on maiden voyage to the Great Lakes upbound for Toledo, OH from Sept Iles, QC Apr. 8, 2010. Kent Malo
Algobay4-08-10-c-km1.jpg (95644 bytes)
Stern view. Kent Malo
100_0164.jpg (102962 bytes)
Arriving at the Welland Canal, Apr. 9, 2010.
Rob Hartley
algobay1-10-rj.jpg (83020 bytes)
Wintering at Portland, ME, Jan. 24, 2010.
Richard Jenkins
algobay1-10-rj-(1).jpg (86171 bytes)
Another view. Richard Jenkins
algobay1-10-rj-(3).jpg (98451 bytes)
Stern view. Richard Jenkins

Algobay towed by Commodore Straits in the St. Lawrence Seaway near Montreal, QC, May 16, 2008.
Kent Malo
04-Simoon101001msd.jpg (49013 bytes)
Ocean tug Simoon that towed the Algobay from Gibraltar to China (seen here on the St. Lawrence River, Oct. 1, 2010. Michel St-Denis
algobayfore.jpg (6129 bytes)
Forebody launch video from China, Mar. 30, 2009.
Bay-3-2-8-wb.jpg (112637 bytes)
Waiting at Hamilton's Wharf 10, Mar. 2, 2008.
Wayne Brown
Bay-3-2-8-wb1.jpg (74084 bytes)
Another view. Wayne Brown

At Hamilton from a distance with the James Norris and Algoisle, Mar. 23, 2008. John McCreery

Toronto, ON lay up, Jan. 24, 2004. Murray Smith

Laid up at Toronto, Feb. 24, 2007.
Mark Leitch

Profile. Mark Leitch

Welland Canal, Dec. 24, 2002.
Jeff Thoreson

Stern view. Jeff Thoreson

Laid up at Toronto, ON, Nov. 29, 2003.
Neil Walsh

Detroit River, Sept. 3, 2002. Mike Nicholls

 Stern view, Sept. 3, 2002. Mike Nicholls

Whitefish Bay, Nov. 15, 2002. Paul Beesley
On board views from the summer of 2002.
Ken Hamilton

D
eck sprinklers on to prevent hogging on a hot summer day in the Welland Canal.

Welland Canal passage
.

Another view.

Welland Canal.

Inbound Hamilton, ON

Soo Locks.

Another view.

Another view, Soo Locks.

Foggy Lake Superior crossing.

Fuelling in Duluth, MN.

algobay.jpg (90002 bytes)
Upbound the Welland Canal approaching Lock 3, Oct. 12, 1985. Marc Dease

Damage after collision with the Montrealais,
June 1980. John Hopkins courtesy Paul Beesley

Profile of the damage. John Hopkins

Upbound approaching Lock 1 of the
Welland Canal, 1998. Andy Torrence

Aerial view underway. Don Coles

In the Welland Canal. Chris Franckowiak

Inbound Toledo. 
Jim Hoffman

Docked. Rod Burdick

Turning in Conneaut, OH harbor,
Nov. 6, 2000. Jeff Thoreson

Another view. Jeff Thoreson

Detroit River, June 16, 2001.
Mike Nicholls

Detroit River, July 6, 2001. Mike Nicholls

Stern view. Mike Nicholls

Upbound the Detroit River, July 21, 2001.
Mike Nicholls

Entering the St. Clair River at Point Edward, ON,
Sept. 1, 2001. George Wharton

Bow profile passing the Fort Gratiot Light,
Sept. 1, 2001. George Wharton

Detroit River, Sept. 1, 2001. Mike Nicholls

 Stern view. Mike Nicholls

Loading in Windsor, Sept. 29, 2001. Mike Nicholls

Stern view. Mike Nicholls

Welland Canal, Nov. 10, 2001. Alex Howard

Passing the Canadian Provider at Port Colborne, ON, Nov. 24, 2001. Jeff Thoreson

Welland Canal, Nov. 24, 2001.
Jeff Thoreson

Stern view Jeff Thoreson

Another view. Jeff Thoreson

Winter lay-up, Port Colborne, ON Jan. 15, 2002.
Alex Howard

Stern view. Alex Howard

Winter lay-up at Port Colborne, ON with the
Rt. Hon. Paul J. Martin astern, Feb. 23, 2002.
George Wharton

Detroit River, June 9, 2002. Mike Nicholls

Upbound the Welland Canal at Port Colborne,
July 13, 2002. George Wharton

Stern view, Port Colborne.
George Wharton

Detroit River, Aug. 15, 2002. Mike Nicholls

Stern view. Mike Nicholls

Engine room gangway door.

Bow thruster. Ted Siuda