On July 24, 2002, Algoma Central Corp., St. Catharines, ON announced an agreement to construct a double-hulled OPA-90 compliant petroleum-product/chemical tanker at an approximate cost of $47 million (CN). In keeping with Algoma’s program of replacing its single-hull tankers with vessels of double-hull construction, their single-hulled tanker Algofax would be retired when this new vessel entered service. The keel for this new tanker was laid on June 29, 2003 at Jiangnan Shipyard (Group) Co., Ltd., Shanghai, China as their hull # H2291.

Written by Roger LeLievre.

Vessel Details

IMO No. 9273222
Year Built 2003
Builder Jiangnan Shipyard Co., Ltd.
(Shanghai, China)
Length 488’3″ / 148.82m
Beam 78′ / 23.77m
Depth 42′ / 12.8m
Midsummer Draft 31′ / 9.44m
Cargo Pumps 12 pumps @ 500 m³/hr each
Capacity 130,166 bbl / 20,695 m³ / 19,160 t
Engine Power 8,445 bhp diesel
Previous Names (None)
Previous Fleets (None)