Burns Harbor

The keel was laid on April 16, 1979 for this self-unloading bulk freighter at Bay Shipbuilding Co., Sturgeon Bay, WI, as their hull # 720. The new 1,000-footer was launched Oct. 28, 1979 and christened Burns Harbor on May 24, 1980 for Wilmington Trust, Wilmington, DE,...

Indiana Harbor

The Indiana Harbor was constructed in 1979 as a self-unloading bulk carrier for American Steamship Company. She was the ninth 1,000-Footer to be constructed and was the second built for American Steamship Company, being constructed under Title XI of the Merchant...

St. Clair (2)

The St. Clair was launched July 24, 1975 at Bay Shipbuilding in Sturgeon Bay, WI. When hull # 714 slid down the ways, she was the largest vessel ever to be side launched, built at a cost of $24.3 million. St. Clair was built primarily to deliver western low sulfur...
Walter J. McCarthy Jr.

Walter J. McCarthy Jr.

The Belle River was constructed in two sections, with her 660′ bow section being built first and side launched at Sturgeon Bay on September 30, 1976, while her 340′ stern section was under construction in the large graving dock. The sections were welded together in...
Atlantic Huron

Atlantic Huron

Launched October 18, 1983 as the Prairie Harvest for CSL Group Inc. (Canada Steamship Lines, Inc.), Montreal, PQ; this vessel was built as a “Caribbean Class” lake bulk freighter by Collingwood Shipyards Ltd., Collingwood, ON at a cost of approximately $35...
Baie Comeau (2)

Baie Comeau (2)

In October 2010, the Government of Canada elected to remove a long standing 25% import duty on vessels built in foreign yards and brought under Canadian flag. This duty had been put in place to protect Canadian shipyards from foreign competition but was becoming...