Drydocking Ends, Oakglen Fitting Out

June 21, 2026

Canada Steamship Lines bulk carrier Oakglen was refloated today at Ontario Shipyards in Port Weller Saturday afternoon with assistance from McKeil Marine tugs Jarrett M and VAC, Oakglen was undocked and assisted to the wall where her fitting out will happen prior to sea trials. At the beginning of April, she went into the drydock at Ontario Shipyards for her scheduled 5-year inspection.

Oakglen being removed from the drydock, with tug Jarrett M assisting. [Amy Daggett]

Amy Daggett – Ship Junkies – Lakes, Locks & Rivers (LL&R)