Boatnerd News

Boatnerd News – December 16, 2022

Great Lakes cargo shipments are down 6.82% this year.

Ships have carried 31.53 million tons of cargo to ports including the Ports of Indiana-Burns Harbor and the Port of Chicago, down from 33.84 million tons last year.

Ports of the Great Lakes traded with at least 19 countries via the St. Lawrence Seaway during November, up from 18 the previous month.

“Shipping on the Great Lakes St. Lawrence Seaway System depends on the capabilities of a network of highly capable ports that help feed the world and empower our economy at home,” said Adam Tindall-Schlicht, administrator of the Great Lakes St. Lawrence Seaway Development Corp. “The November tonnage report is another indicator that international supply chains through Great Lakes ports are diverse and reliable as we near the close of the 2022 shipping season.”

Transits rose 1.71% to 3,502 so far this year, up from 3,443 during the same time in 2021.

Shipments of grain are down 2.61%, according to the Great Lakes St. Lawrence Seaway Development Corp. Shipments of coke are up 15.97%, potash 184.65%, salt 17.23%, petroleum products 27.45% and general cargo 135.66%.

The Illinois International Port District handled many steel products last month.

“We’ve seen significant regional supply chain diversions this year, which has positioned Chicago as a key destination for commodities like steel, plywood, sugar, and non-ferrous metals,” said Erik A. Varela, executive director of the Illinois International Port District. “Thankfully we’ve been up to the task and have been able to help deliver these commodities that uplift the region’s economy.”

The steel trade has remained robust on the Great Lakes, to the point where it’s funding reinvestment in capital projects at the ports.

“We are handling about 20% more cargo since the Cleveland Cliffs HBI plant went into production at the Port of Toledo two years ago,” said Joseph Cappel, vice president of business development for the Toledo-Lucas County Port Authority. “We will build on our new baseline by continuing to make improvements to our dock and material handling capabilities making the necessary investments that will modernize our facilities. The acquisition of a Liebherr 550 mobile harbor crane, the reconstruction of the dock wall at Midwest Terminals, a new conveyor system, and the addition of a multi-modal liquid bulk transload facility represent over $32 million in recent project investment at the Port of Toledo.”

NWI Times

 

Repairs Continue on Algoma Compass

HAMILTON, ON – Work is continuing repairing damaged incurred by Algoma Compass when she hit a bridge abutment in the Welland Canal Nov. 21.

See image gallery for photos by Kristine Schneider.

 

MacArthur Lock closing for seasonal repair, maintenance

SAULT STE. MARIE, Mich. – The Soo Locks’ MacArthur Lock will close to marine traffic 7:00 a.m. Dec. 17, 2022, through 12:01 a.m. April 24, 2023, to perform critical maintenance.

The Poe Lock will remain open until 11:59 p.m. Jan. 15, 2023, or until commercial traffic ceases, whichever occurs first. The operating season is fixed by federal regulation and is driven in part by vessel operability in typical ice conditions.

“The 800-foot-long MacArthur Lock, built in 1943, is 79 years old; the maintenance period is critical to keeping the lock in operation during the shipping season,” Maintenance Branch Chief Nicholas (Nick) Pettit said.

Pettit, new Maintenance Branch Chief at the Soo Locks will oversee the team executing this year’s seasonal repairs.

Boatnerd News – December 15, 2022

Storm on Upper Great Lakes Sends Vessels to Shelter

Easterly winds on the northern Great Lakes have sent many vessels to anchor, or to set courses that bring them into the lee of the land.

As of 10 am. Thursday:
Anchored off Superior, WI: CSL Assiniboine, Presque Isle, Joyce L. VanEnkevort. CSL Niagara remains at the ore dock.
Western Lake Superior off Sand Island: John G. Munson, Walter J. McCarthy Jr.
East of Ashland, WI: Rt. Hon. Paul J. Martin
West side of Keweenaw Peninsula: Stewart J. Cort, Algoma Guardian, Edgar B. Speer
Above the Soo Locks: Mark W. Barker, Florence Spirit, Capt. Henry Jackman, Resko, Hon. James L. Oberstar, American Century
Above DeTour: John J Boland, American Mariner, Joseph L. Block, Lee A. Tregurtha, Manitowoc
Off Cockburn Island: Manitoulin
Straits: Great Republic, H. Lee White, Arthur M. Anderson

GALE WARNING REMAINS IN EFFECT UNTIL 7 PM EST THURSDAY
WHAT…Highest gusts up to 45 kts from the east and highest waves around 8 feet.
WHERE…Whitefish Bay (U. S. Portion)/Whitefish Point to Point Iroquois MI and St. Marys River Point Iroquois to E. Potagannissing Bay.

One vessel was moving in the St. Marys River Thursday morning. MIchipicoten arrived at unload at Algoma Steel. She will stay there until the wind moderates.

 

Lakes Limestone Trade Down in November

CLEVELAND — Shipments of limestone on the Great Lakes totaled 2.5 million tons in November, a decrease of 24 percent compared to a year ago.  Limestone cargos were 15.1 percent below the month’s 5-year average.

Loadings from U.S. quarries decreased 23.1 percent from 2021 to 2.1 million tons.  Shipments from Canadian quarries totaled 450,529 tons, a decrease of 28 percent.

Year-to-date the limestone trade stands at nearly 27.5 million tons, a decrease of 1.6 percent compared to a year ago.  Loadings from Michigan and Ohio quarries decreased by less than 1 percent to nearly 22 million tons, while shipments from Ontario quarries total 5.6 million tons, a decrease of 4 percent from 2021.

Lake Carriers’ Association

 

Soo Locks Construction Project Enters Third Phase Amid Skyrocketing Costs

SAULT STE. MARIE, MI – As work on the new Soo Lock in Sault Ste. Marie shifts towards nearly a decade of construction, it’s facing a wave of new problems nearly every sector is dealing with, including increased costs and a lack of workers.

Construction on the new Soo Lock began in 2018. The project was broken into three phases, and phase two is nearing completion. The U.S. Army Corps of Engineers is preparing to begin phase three soon, which is expected to be completed in 2030. “The bulk of the work will kick off in April,” said project engineer Kristina Schnettler. “So, most of our work will happen from April into December each year, with some work happening from December to April if the winter allows it.”

Phase three is expected to be the most work intensive portion of the construction effort. And with rising construction costs, as well as worker shortages, the total cost projection for the project has nearly tripled in the past few years.

“We’re working on getting reauthorized at about $3.2 billion, where previously we were authorized at $922 million,” Schnettler said. “So, we did see quite a cost increase, and a lot of that is due to inflation and also a national workforce shortage and other market stabilization issues that we’re seeing across the country.”

The adjustment was made back in the winter of 2021, while the third phase’s contract was being reassessed. The Army Corps will need to continue looking for funding each year in order to keep up with the price tag.

The Corps should also receive over $200 million from the Defense Act and the Water Resources Development Act, which passes every two years.

“To date, we’ve received $1.585 billion of that $3.2 billion” Schnettler said. “About $700 million of that is for the construction itself, and the rest of that is contingency money for if we see any changes on the project or any additional work we need to do.”

Schnettler said the hope is always to stay below their total funding. But considering recent economic trends, it’s better to be prepared and make sure this piece of critical infrastructure is completed.

The second and third phase of construction will overlap when work starts back up in the spring. Phase two should wrap up by 2024.

Up North Live

Boatnerd News – December 14, 2022

Defense bill includes new $3.2B spending limit for Soo Lock project

WASHINGTON, DC – The defense policy bill approved Thursday by the House includes new spending authorization for the ongoing project to build a new Soo Lock at $3.2 billion, which is triple what it had been expected to cost but should allow construction to stay on track.

The U.S. Army Corps of Engineers had requested the reauthorization this fall, citing record levels of inflation, a “robust” construction workload across the country and a national labor shortage as contributing to the cost increase, as well as modifications to the design to improve safety and operability

U.S. Sen. Debbie Stabenow, a Lansing Democrat who has long supported the project, said Thursday the reauthorization language is “really good news.”

“This allows the project to get done,” Stabenow told The Detroit News. “The most important thing is that there’s a full commitment from the Congress, from the Army Corps of Engineers, from the administration. So it’s not going to be stop-start, which has been of concern to me.”

Roughly $1.585 billion has already been allocated to the project, which would modernize the shipping lock complex on the St. Marys River in the Upper Peninsula connecting Lake Superior to the lower Great Lakes. The government has stressed the critical role the shipping channel plays in the North American economy and the nation’s supply chain of iron ore for manufacturing.

Stabenow added that she’s working with the House and Senate appropriations panels to ensure funding for the project is included in the omnibus spending bill for fiscal 2023.

Detroit News

 

U.S. Steel casting pig iron in major milestone at new Gary Works facility

U.S. Steel’s new pig iron facility at Gary Works steel mill recently reached a major milestone when the $60 million pig caster produced its first batch of pig iron.

It has since cast several full ladles, totaling more than 1,000 tons of pig iron.

Scott Buckiso, a U. S. Steel senior vice president and the chief manufacturing officer of the North American Flat-Rolled Segment, said the achievements were months ahead of schedule.

“Congratulations to the entire team at Gary Works on achieving this latest milestone,” he said. “Thanks to strong leadership and tremendous collaboration across the plant and at the project site, we’re well on our way to delivering on a key aspect of our Best for All strategy and doing so safely, ahead of schedule and on budget.”

U.S. Steel continues to ramp up the pig caster at the steel mill at 1 N. Broadway in downtown Gary. It plans to begin full production sometime in the first half of next year.

The new pig caster converts iron ore, hauled by lake freighters across Lake Michigan, into pig iron to feed its new electric arc furnaces in Arkansas as well as its blast furnaces.

U.S. Steel President and CEO David Burritt visited the steel mill on the Lake Michigan lakefront earlier this year for the groundbreaking of the project. He said it would “create the necessary material for our lower-emissions electric arc furnaces” and “is the perfect example of combining the best of integrated and mini-mill technologies.”

It is supplied by iron ore from U.S. Steel’s mines in Minntac and Keetac in Northern Minnesota’s Iron Range. It will produce up to 500,000 tons of pig iron a year, producing 50% of the metallics needed for the steelmaker’s new Big River Steel Works.

NWI Times

Boatnerd News – December 13, 2022

St. Lawrence Seaway closing December 31

The shipping season is once again coming to an end.

For the 2022 navigation season, all vessels have been directed by Great Lakes-St. Lawrence Seaway officials to clear the seaway by 11:59 p.m. on December 20, according to a Seaway notice.

The closing period officially began on December 1 and will continue until the last ship has completed its transit.

The Montreal-Lake Ontario section of the Great Lakes-St. Lawrence Seaway System is set to close on Saturday, December 31.

This means that all vessels must be out of this portion of the seaway by noon on December 31. Officials stated that any transit of the Montreal-Lake Ontario section after December 24 will have to have a prior written agreement.

Corporations have also waived operational surcharges for vessels from December 21 to December 24.

Regarding the rest of the Seaway, the Welland Canal portion is set to close at noon on Saturday, January 7, 2023. The Sault Ste. Marie Locks and Canal will close on Sunday, January 15, 2023.

The full closing notice can be found on the Seaway’s website.

Inform NNY 

 

Coast guards in Canada and U.S. working together to protect Great Lakes

Shared waters from the Atlantic and Pacific oceans, Beaufort Sea, through to the Great Lakes will be protected from threats of pollution under an agreement between the Canadian and U.S. coast guards.

Last month, Canadian Coast Guard Commissioner Mario Pelletier and U.S. coast guard Commandant Admiral Linda L. Fagan renewed the Canada-United States Joint Marine Pollution Contingency Plan.

“The agreement reflects the excellent continuing bilateral collaboration between our two organizations, including in preparedness and response to marine pollution incidents in our shared waters,” said Pelletier, in a release from the Canadian Coast Guard.

It provides a co-ordinated system for planning, preparedness and response to spills occurring in the waters between the two countries, a release said.

Pelletier said the plan represents a model framework for how two like-minded countries can work effectively together with a common purpose.

The plan allows for a co-ordinated mechanism for planning, preparing for and responding to spills in transboundary waters and establishes procedures for the co-ordination of spill response efforts between the two nations.

Fagan said it signifies the excellent partnership between the two agencies and advances their preparedness for responding to transboundary oil spills and marine incidents.

“The U.S. coast guard looks forward to continuing our collaborative work to protect our shared maritime environment,” she said.

The two agencies work closely together on a wide range of coast guard services, including environmental response, search and rescue, icebreaking, marine traffic management and aids to navigation.

Welland Tribune

 

Lake Superior gains astounding 6 trillion gallons in same time Lakes Michigan, Huron lose 7 trillion

Lake Superior’s water level has moved dramatically in the opposite direction from the other four Great Lakes.

The Great Lakes are in the normal seasonal decline. As the air turns colder, precipitation amounts are lower. At the same time, the big temperature difference between near the water surface and higher altitudes creates more evaporation. Lake Superior water levels and the rest of the Great Lakes usually decline from November to December.

This year, Lake Superior declined one inch from November to December. The rule of thumb from Keith Kompoltowicz of the U.S. Army Corps of Engineers is one inch of water on Lake Superior equals 550 billion gallons of water. Lake Superior lost 550 billions gallons of water then in the last 30 days.

Last week I wrote how Lakes Michigan and Huron actually declined quite a bit for November, losing over 3 trillion gallons of water.

When we look at the bigger picture of water level movement on the Great Lakes, most of the Great Lakes had receding water levels in the past year. This is not the case for Lake Superior.

Lake Superior is now 11 inches higher than this time last year. With the rule of thumb for gallons per inch, Lake Superior now holds around 6 trillion gallons more water than December 2022.

The lake level graph for Lakes Michigan and Lake Huron looks much different. Lake Michigan and Lake Huron are nine inches lower than December 2021. This represents a decrease of 7 trillion gallons of water over the past year.

While the rest of the Great Lakes are falling, Lake Superior is rising.

The reason is simple, according to Kompoltowicz. Lake Superior’s drainage basin had above normal amounts of precipitation while Lake Michigan and Lake Huron had less precipitation than normal.

The chart above shows Lake Superior’s basin had one inch more rain than normal for November. Over the past year, Lake Superior has had 100 percent of its average precipitation. At the same time, Lakes Michigan and Huron had only 70 percent of average rainfall. In the past 12 months Lake Michigan and Lake Huron only received 88 percent of normal precipitation.

MLive

Boatnerd News – December 12, 2022

Saltie Patagonman Grounds in Seaway after Engine Trouble

The saltwater vessel Patagonman ran aground below Cote St Catherine Lock in the Seaway Sunday due to engine trouble. All traffic was stopped until the Groupe Ocean tugs Ocean K. Rusby and Ocean Pierre Julien arrived to pull her free in the evening, after which docked at  Baillargeon Pier. Marine Traffic lists the 2019-built vessel, formerly named San, as owned by Polish Shipping Co. (POLSTEAM).

Jean-Denis Landry, Ron Beaupre

 

Removal of Abandoned Tugboat Donny S Stalled

BAILEYS HARBOR, WI – The Donny S tugboat, abandoned in Baileys Harbor for about a year now, was built in Texas in 1950 and retired from service in the late 2010s after a long career on the Great Lakes, according to a Great Lakes tugs and workboats database that contains the boat’s history. She was sold in 2021 and towed to Baileys Harbor, according to that history, where she was expected to be scrapped – and where she remains.

Though it was supposed to be removed on Dec. 4, an abandoned tugboat remains a fixture on the water near Baileys Harbor Yacht Club. 

The 143-foot-long Donny S has been moored in Baileys Harbor for over a year, according to Mike Kahr, who owns property nearby. Kahr has watched the boat being battered by storms and was concerned it would eventually end up as wreckage on the beach. 

“It’s not a question of if, but when, it ends up scattered on the beach,” said Kahr, who has contacted the Coast Guard and the Department of Natural Resources (DNR) to try to have the boat removed. 

Even if the boat remained in the water, DNR conservation warden Mike Neal said it could present an environmental hazard. As boats deteriorate, they may leak fuels or other hazardous materials into the water. They also obstruct navigation. That’s why state statutes prohibit abandoning watercraft.

“It’s like leaving a wrecked car alongside the road,” Neal said.

Removing this boat proved more difficult than simply towing an abandoned car. The DNR gave the owner a series of deadlines. None of those were met, so the DNR issued citations for obstruction of navigable waterways to push the issue. Those were supposed to lead to the most recent date for removal, Dec. 4, which didn’t happen.

The boat is a hull with no engine, so it will have to be towed, according to Neal. To tow an abandoned boat, the U.S. Coast Guard has to issue a towing plan, do an inspection to determine possible environmental hazards and have five licensed people on the vessel before the boat can be removed.

Neal said he did not know why the boat wasn’t removed as planned on Dec. 4. The Pulse reached out to the Coast Guard to learn the status of the towing plan but did not hear back by deadline. Neither is the name of the owner known – Neal said he could not divulge the name and the Pulse is awaiting word from Madison. 

The owner of the boat is a Baileys Harbor resident, Neal said, but it took him awhile to trace the ownership. The vessel is a federally-documented boat, so the Coast Guard — not the state of Wisconsin — deals with its registration. Neal ran the boat’s numbers in the Coast Guard’s system and found that the boat changed ownership several times. Because of that, Neal spent around four months contacting people throughout the country to try to figure out the boat’s current owner.

“It comes back to this entity in Ohio,” Neal said. “You call that company, they say, ‘no, we sold it.’ You’re just chasing dead ends all the time.”

Neal speculated that the owner abandoned the boat after learning the process of disassembling it for scrap steel would be more involved than anticipated.

“I’m assuming at some point, they just got to a point where it was no longer cost-effective for them to try and [scrap] it,” Neal said.

Door County Pulse

Boatnerd News – December 11, 2022

DTE Energy officially retires St. Clair Power Plant

ST. CLAIR, MI – DTE Energy last Thursday officially announced the retirement of the St. Clair Power Plant and is retraining displaced workers for jobs elsewhere in the company.

Michigan’s largest producer of clean energy has retired the facility, along with the Trenton Channel Power Plant in Trenton, in an effort to bring southeast Michigan closer to a carbon-free future with more affordable and reliable energy.

“Retiring these plants is another step in DTE’s plan to deliver affordable, reliable and clean energy through a modern grid that meets the needs of our customers’ changing lifestyles and our state’s new economy,” DTE Chairman and Chief Executive Officer Jerry Norcia said in a news release. “These steps today will lead to a cleaner environment and energy future for Michigan families, communities and businesses.”

For nearly 100 years, the St. Clair and Trenton Channel power plants served southeast Michigan residents. The St. Clair Power Plant began operations in 1953, while the Trenton Channel Power Plant was built in 1924 to address the growth of Michigan’s post-World War I and II economy. Following the end of WWII, the St. Clair plant was commissioned, and at its peak, provided nearly 2,000 MW of electricity to power the growth of Michigan’s businesses and manufacturing sector.

This past summer, DTE began the long-planned retirement of both plants, placing the St. Clair facility on standby-only status to meet periods of high customer demand or extreme temperatures.

With the year drawing to a close, DTE has officially retired both plants, and employees at both locations were offered opportunities to continue to work for the enterprise.

DTE said it is continuing to make progress on its clean energy journey by transitioning from coal to cleaner sources of energy such as renewables and natural gas. On Nov. 3, the company released its CleanVision Integrated Resource Plan, a 20-year proposal to transform how the company generates electricity as part of its clean energy journey.

The Voice

 

Federal labor regulators and Superior police investigating death of worker at Superior shipyard

SUPERIOR, WI – Federal labor regulators and Superior police are investigating the death of a worker who fell off a ship Monday at Fraser Shipyards in Superior.

The Superior Police Department said police, fire and emergency services responded to a call around noon yesterday for a man who fell about 50 feet from a boat in dry dock at the shipyard.

Police said the deceased is a 64-year-old man from Watertown, Wisconsin. His name is being withheld pending notification of the worker’s family. Authorities say they don’t suspect foul play at this time.

A spokesperson with the U.S. Occupational Health and Safety Administration confirmed Tuesday the federal workers’ safety agency is also investigating the incident. The agency said the man was employed with Gillett-based sandblasting company C&L Contracting.

“Preliminary information is that an employee was standing on a railing in order to pull a tarp, and he slipped and fell, landing in the dry dock area,” an OSHA spokesperson said in an email.

Officials with Fraser Shipyards were not immediately available for comment on Tuesday.

The man’s death is the second at the shipyard in five years. Welder Joe Burch died in 2017 after being severely burned on the job. Federal labor regulators fined Fraser around $12,000 after discovering the man wasn’t wearing protective gear.

The next year, more than 60 workers reached a $7.5 million settlement with the shipyard for exposure to unsafe lead levels while working on a Great Lakes ship in 2016. A report by Wisconsin and Minnesota health officials released in 2017 showed 171 out of 233 workers tested had blood lead poisoning.

A federal worker’s safety agency fined Fraser $1.4 million for safety violations in 2016. The shipyard later reached a $700,000 settlement without admitting fault or liability after the agency cited them for 14 violations related to lead exposure.

Fraser Shipyards has been operating in Superior for more than 130 years.

Wisconsin Public Radio

 

Lake Superior gains astounding 6 trillion gallons in same time Lakes Michigan, Huron lose 7 trillion

Lake Superior’s water level has moved dramatically in the opposite direction from the other four Great Lakes.

The Great Lakes are in the normal seasonal decline. As the air turns colder, precipitation amounts are lower. At the same time, the big temperature difference between near the water surface and higher altitudes creates more evaporation. Lake Superior water levels and the rest of the Great Lakes usually decline from November to December.

This year, Lake Superior declined one inch from November to December. The rule of thumb from Keith Kompoltowicz of the U.S. Army Corps of Engineers is one inch of water on Lake Superior equals 550 billion gallons of water. Lake Superior lost 550 billions gallons of water then in the last 30 days.

Last week I wrote how Lakes Michigan and Huron actually declined quite a bit for November, losing over 3 trillion gallons of water.

When we look at the bigger picture of water level movement on the Great Lakes, most of the Great Lakes had receding water levels in the past year. This is not the case for Lake Superior.

Read more at this MLive link: https://www.mlive.com/weather/2022/12/lake-superior-gains-astounding-6-trillion-gallons-in-same-time-lakes-michigan-huron-lose-7-trillion.html

Related story at this MLive link: https://www.mlive.com/weather/2022/12/lake-michigan-lake-huron-lose-over-3-trillion-gallons-of-water-in-november.html

Boatnerd News – December 9, 2022

Great Lakes Iron Ore Trade Up 4.5 Percent in November

 

CLEVELAND – Shipments of iron ore on the Great Lakes totaled 4.4 million tons in November, an increase of 4.5 percent from 2021. Shipments were below the month’s 5-year average by 6.4 percent.

 

Year-to-date the iron ore trade stands at 38.3 million tons, a decrease of 18.6 percent compared to the same point in 2021. Through November iron ore loadings are 17.7 percent below their 5-year average for that timeframe.

 

Since 1880, Lake Carriers’ has represented the U.S.-flag Great Lakes fleet, which today can move more than 90 million tons of cargos annually that are the foundation of American industry, infrastructure, and power: iron ore, stone, coal, cement, and other dry bulk materials such as grain, salt, and sand.

Lake Carriers’ Association

Boatnerd News – December 8, 2022

Lake Michigan, Lake Huron lose over 3 trillion gallons of water in November

The two Great Lakes that surround Lower Michigan continue to trek downward on lake levels. Lake Michigan and Lake Huron are now approaching their long-term average water level.

Lake Michigan and Lake Huron are in their seasonal decline. We do normally expect the lake levels on Lakes Michigan and Huron to fall during November. The amount of evaporation is usually higher than the amount of precipitation in November as cold weather takes over. The colder air holds less moisture.

According the the U.S. Army Corps of Engineers, the Lake Michigan and Lake Huron water level declined 4 inches in the past month. Since Lake Michigan and Lake Huron are connected with free-flowing water at the Straits of Mackinac region, hydrologically they are measured as one lake.

Read more and view charts at this MLive link: https://www.mlive.com/weather/2022/12/lake-michigan-lake-huron-lose-over-3-trillion-gallons-of-water-in-november.html

Boatnerd News – December 6, 2022

Coast Guard Christmas ship arrives in Chicago with 1,200 trees from Michigan

The U.S. Coast Guard announced this weekend that its 2022 Christmas Tree Ship run has been a success. The crew of the cutter Mackinaw pulled up alongside Navy Pier a few days ago and has now finished offloading 1,200 Christmas trees, which will go to Chicago area families.

The Mackinaw’s annual holiday cheer trip traces the path of the ill-fated Rouse Simmons, the Great Lakes’ famous Christmas Tree Ship which sank in Lake Michigan in 1912 while carrying a huge load of holiday trees from Northern Michigan to Chicago.

The Mackinaw and its crew left Michigan in late November, motoring down Lake Michigan and working along the way. The crew was collecting the big warm-weather aids to navigation from the lake and offloading them on land for the winter. On Thursday, the Mackinaw pulled into Chicago and the tree festivities began.

“The U.S. Coast Guard Cutter Mackinaw WLBB 30 has had a busy two days!,” the Coast Guard Great Lakes unit posted on Facebook this weekend. “#ChristmasTreeShip arrived yesterday and the crew was busy decorating the cutter with volunteers from Chicago’s Christmas Ship (CCS) Committee … .”

Tours of the Mackinaw were offered, and there were speeches and even a drum line performance.

MLive

 

World Ship Society report of casualties, demolitions

Vessels with a Great Lakes / Seaway connection reported as a casualty or sold for demolition. Taken from December 2022 issue of Marine News – Journal of the World Ship Society.

Casualties: ALE (9521825; Raba-21) 13,579/2022 – Singapore flag – general cargo ship operated by Bulkship Management, Norway touched bottom on 14/9/2022 in Conception Bay off Kelly’s Island, Newfoundland, Canada.  The propeller and rudder were damaged and she was towed by Canadian tugs Atlantic Fir (9324916) 402/05 and Atlantic Larch (9193745) 392/99 to Les Mechins, Quebec, Canada arriving 10/10/2022

Sold for Demolition: S.T. CRAPO (5304011; United States of America) 9,144/1927 – non-propelled bulk cement barge.  By Lafarge North America, Inc. United States of America, to Marine Recycling Corp., Canada and arrived Port Colborne, Ontario on 29/09/2022.  Commenced 29/09/2022.

Report compiled by Barry Andersen and René Beauchamp

Boatnerd News – December 4, 2022

Marinette County shipwreck added to National Register of Historic Places

A Northeast Wisconsin shipwreck has been added to the National Register of Historic Places.

The wreck of the Sidney O. Neff was added to the register Nov. 7. This follows listing on the State Register of Historic Places in September.

Since 1939, the wreck has sat in 10-15 feet of water on the bottom of Green Bay in Lake Michigan, near the entrance to the Marinette Harbor.

According to the Wisconsin Historical Society, the Sidney O. Neff was launched on Nov. 25, 1890, from the Burger & Burger shipyard in Manitowoc. It worked in the Great Lakes lumber trade into the early 20th century. The ship was sent to Milwaukee in 1898 to be converted into a single screw steambarge. From 1919 to 1924, it was known as the M.C. & M.C. No. 2.

“This vessel spent all of its life working in the Great Lakes region, but because of the work that it was doing, it was able to fuel the growth of Milwaukee and Chicago,” said Caitlin Zant, maritime archaeologist with the Wisconsin Historical Society. “It reached hinterland communities up in northern Wisconsin and northern Michigan that, really, some of the only ways transportation was occurring to those areas easily was via waterways.”

By 1934, the Sidney O. Neff was sitting at harbor in Marinette while it awaited the outcome of a court case. Eventually, it was declared unseaworthy and abandoned in the Menominee River at the east end of the Marinette Fuel & Dock Company slip. In 1939, its machinery was salvaged and the Sidney O. Neff was towed outside the Marinette Harbor and sunk.

The Sidney O. Neff currently sits upright and broken. Many of its hull components remain, with artifacts including the engine and propeller.

The historical society says the wreck allows historians and archaeologists to study the construction of early converted wooden steambarges in the Great Lakes lumber trade.

National Register of Historic Places protection means that divers may not remove artifacts or structure from the wreck.

Zant says, depending on water conditions, the wreck mat be visible to boaters on the surface.

Fox 11 News

 

St. Joseph Harbor dredging delayed by weather

St. Joseph Harbor traffic has been severely limited the last five weeks due to debris in the water.

And if they weather doesn’t improve, it could take even longer for the harbor to be fully operational again.

In mid-November, the US Army Corps of Engineers awarded a contract to King Company of Holland, Michigan to dredge the St Joseph Harbor. The 1.3-million-dollar contract was awarded quickly, but the project reached another snag

This all stems from an incident involving a 630-foot-long carrier.

In mid-October, it ran aground due to the large amount of sand and debris built up on the lake floor, at the mouth of the harbor.

Now after the surveys, all the pieces are in place.

“The Corps of Engineers worked diligently along with everyone else involved, all the stakeholders, all the politicians, members of the public everybody came together and got behind this, and within a month, we had a contract in place,” said Mike Moran, St. Joseph Harbormaster.

According to the US Army Corps of Engineers, the King Company was supposed to dredge over 14 thousand cubic yards of debris by the end of December. But the weather has once again caused crews to hit the brakes.

“If the weather isn’t cooperating, if the waves are too rough or the winds are too high, we can’t get the equipment towed down safely, so right now we’re just waiting for the weather to cooperate,” said Moran.

This is not the first time King Company has dredged the St. Joseph Harbor.

They did work back in the summer of 2020, as well as a few other related projects.

Therefore, they’re familiar with the area and the challenges Lake Michigan brings.

But until dredging can be completed, the harbor cannot take in large vessels.

Some can get into the harbor with assistance of tugboats, but it puts a strain on an already difficult process.

“Using extra tugboats adds to the complexity and the time and the cost of material overall, so it’s definitely not an ideal situation,” said Moran.

Moran says it isn’t the end of the world if they can’t get the dredging done this year their focus would then shift to the first available time in the spring.

Despite these roadblocks, the Harbormaster is optimistic about getting things back to normal.

Now, it’s up to Mother Nature to see when the dredging can start.

WWMT

On This Day

  • 1838 TOLEDO (2-mast wooden schooner, 98 foot, 215 tons, built in 1836, at Buffalo) was carrying dry goods valued at more than $100,000 up-bound on Lake Erie when she was driven ashore by a gale a half mile east of the mouth of the Grand River. She broke in two. No lives were lost. 1852 BUCKEYE STATE (3-mast wooden bark, 132 foot, 310 tons, built in 1852, at Black River, Ohio) stranded off S. Milwaukee Point on Lake Michigan in a storm and was then broken up by waves. This was her first year of operation and she had been…

Read More

Noteworthy Passages

Lake Erie Ports – July 14

Toledo, OH:  Arrivals were Kathy McKeil to Midwest Terminals, Federal Hunter to The Andersons and Algoma Niagara, also to The Andersons. Defiance/Ashtabula is still at ADM/Mid America Salt. Departing were John J. Boland to Charlevoix and Kathy McKeil to Marinette. Sandusky, OH:  Victory/Maumee arrived to load coal at Norfolk Southern. Cleveland, OH:  Departing were Algoma Buffalo with salt for...

read more

Boatnerd Gatherings

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.