Boatnerd News

Round Island Lighthouse will get Restoration After Years of Weather Damage

STRAITS OF MACKINAC, MI – The Hiawatha National Forest has formed a partnership with the Round Island Lighthouse Preservation Society to ensure essential maintenance work on the Round Island Lighthouse, officials announced.

The little red lighthouse is a landmark in the Straits of Mackinac and is a favorite icon of ferry boat passengers heading to and from Mackinac Island each year.

The collaboration brings a new partner organization to the Forest Service and focuses on addressing deferred maintenance at the historic lighthouse structure. Funded through the Great American Outdoors Act, the initiative will tackle critical repairs including roofing, exterior painting and masonry work designed to protect the lighthouse from deterioration caused by harsh Great Lakes weather conditions.

The preservation project presents unique logistical challenges due to the lighthouse’s remote setting on Round Island, which holds both a federal Wilderness designation and the historic structure. Crews will need to navigate water transport requirements and limited access to resources while working in isolated conditions.

To accommodate these complexities, the restoration work has been scheduled across a three-year timeline, allowing sufficient time for planning and execution. Officials noted that successful completion of the project will require careful coordination, thorough preparation and adaptability from work teams.

The partnership aligns the priorities of both organizations while pooling resources to accelerate preservation efforts and achieve tangible results at the site.

Since it has not been used for navigation in the Straits for decades, Round Island Lighthouse long ago was placed under the auspices of the U.S. Forest Service – the Hiawatha National Forest unit, to be exact. The preservation society and Boy Scout members have handled much of the annual maintenance and spearheaded a 2020 funding drive for new loads of protective rock to guard against erosion when it was clear Forest Service didn’t have the budget surplus to cover it

M Live

Badger Concludes 73rd Sailing Season

LUDINGTON, MI – The Lake Michigan caferry Badger’s 2026 sailing season ended on Sunday, Oct. 11 when she docked for the winter at her Ludington, MI, home port. The Badger, operated by Lake Michigan Carferry, a part of Interlake Maritime Services, offers the largest cross-lake passenger service on the Great Lakes and an authentic steamship experience. The four-hour, 60-mile cruise takes passengers, autos, RVs, tour buses, motorcycles, bicycles, and commercial trucks across Lake Michigan between Ludington and Manitowoc, WI.

 

Badger leaving Manitowoc on September 28. [Roger LeLievre]

Work Begins on Big Sable Point Lighthouse in Preparation for $450K Restoration

HAMLIN TOWNSHIP, MI – This landmark Lake Michigan lighthouse will remain open for tours during a major renovation project scheduled for next summer. A small construction project will soon begin at Big Sable Point Lighthouse, ensuring uninterrupted visitor access during the $450,000 project to restore the exterior of the keeper’s dwelling.

Known for its distinctive black-and-white tower, Big Sable Point Lighthouse is situated on the Lake Michigan shoreline at Ludington State Park. It’s a popular spot, attracting thousands of visitors each year to climb the tower and explore the keeper’s dwelling, despite a 1.8-mile trek each way to reach it.

Work planned for this fall includes repairs to the chimney and the north porch foundation wall of the keeper’s quarters; the north porch will serve as the visitor entrance during 2027. Northern Restoration & Waterproof Systems Inc. is contracted to complete the work, which will take about one week.

“Preserving Big Sable is a significant undertaking, and these projects are part of our long-term commitment to maintaining the lighthouse for future generations,” Greve said. “We are excited to begin this work now and continue that momentum into Big Sable’s 160th anniversary year.”

Big Sable Point Lighthouse is open for 2026 tours and tower climbs through Oct. 25 and will reopen for the 2027 season on May 4. Tower climbs are priced at $8 for adults and $5 for students. Children must be at least 40 inches tall to climb; children may not be carried up the stairs. Footwear with a back around the heel is required to climb.

Next year’s project plans include removing decades-old layers of exterior paint and “organic growth” that has formed between the paint and brick, restoring historic masonry, and repainting with white masonry paint. Removing layers of paint will require a chemical process to avoid further degrading the brick beneath. The work will prevent the building from holding moisture.

The 112-foot tower and original keepers’ dwelling were built in 1867, using Milwaukee “Cream City” brick. In the early 1900s, the tower was encased in metal due to the poor condition of the bricks. The keepers’ dwelling, which was expanded between 1908 and 1914, was first painted in 1942. Today, the paint is cracked and peeling, revealing a layer of green, moss-like growth underneath.

This is Lakeshore Keepers’ largest preservation effort in its 38-year history. Originally named Big Sable Point Lighthouse Keepers Association, the organization formed in 1987 to rescue this light. Operating as Lakeshore Keepers, the group now manages five lighthouses from Whitehall to Manistee.

Other upcoming upgrades at Ludington State Park include a $3.65 million project to rebuild Skyline Trail and a $100,000 amphitheater renovation; these projects are fully funded. In 2024 and 2025, the park’s roads were repaved, pedestrian connectivity was improved, and parking areas were reimagined during a $2.6 million project funded through the American Rescue Plan Act.

Big Sable Point Lighthouse on the Lake Michigan shoreline can be reached by hiking or biking a 1.8-mile sand-and-gravel trail at Ludington State Park. [Justine Lofton]

MLive

Soo Locks Chief Parks Ranger Wins Interpretive Excellence Award

SAULT STE. MARIE, MI – Michelle Briggs, Chief Park Ranger / Interpretive Specialist for U.S. Army Corps of Engineers at the Soo Locks, was presented with the Great Lakes and Ohio River Division award for Interpretive Excellence at a ceremony earlier this week at the Soo Locks Visitor Center by Lt. Col. Donald K. Lew, U.S. Army Corps of Engineers Detroit District. The award reads, in part, “Ms. Briggs revolutionized public outreach by creating “Ranger Reels,” an innovative short-form series. Her leadership and vision resulted in videos that have been viewed over three million times, bringing the mission of the Soo Locks and the U.S. Army Corps of Engineers to a national audience.”

Briggs has also won the prestigious Hiram H. Chittenden Award, which has yet to be presented.

Soo Locks Visitor Center Association

Soo Locks Chief Park Ranger Michelle Briggs with Corps Lt. Col. Donald K. Lew. [Roger LeLievre]

Harriet M Joins Thunder Bay Tug Services Fleet

A new tugboat has joined Thunder Bay Tug Services Ltd. with the arrival of Harriet M in Thunder Bay on October 8, 2026. The tug was acquired from Moran Towing Corporation of Philadelphia, PA. Built in 1978 at Jakobson Shipyard in Oyster Bay, NY, Harriet M measures approximately 28 metres in length and is powered by 3,005 horsepower. She will assist commercial vessels navigating the harbor and support ship movements throughout the Port of Thunder Bay as part of Thunder Bay Tug Services Ltd.’s operations,

Michael Hull

Harriet M arriving at the Port of Thunder Bay. [Michael Hull]

Harriet M arriving at the Port of Thunder Bay. [Michael Hull]

Chi-Cheemaun to Enter Dry Dock Following 2026 Season

OWEN SOUND, ON. – With the 2026 sailing season wrapping up on October 18, the Owen Sound Transportation Co. reminds passengers and community members that the MS Chi-Cheemaun will proceed to dry dock for her five-year inspection following the end of the season. OSTC does not anticipate the vessel will return to Owen Sound harbor for her winter berth this year; should this change, updates will be posted at ontarioferries.com. With the vessel scheduled for inspection, there will be no fall repositioning cruise this year.

Chi-Cheemaun earlier this year. [Stephen Sostaric]

Owen Sound Transportation Co.

BBC Philippines Offloading LNG Tanks at Sturgeon Bay

STURGEON BAY, WI – The 482-foot-long heavy lift vessel BBC Philippines is at Sturgeon Bay, WI, delivering a cargo of Liquid Natural Gas (LNG) tanks. The tanks are for the new build 3794, a bunkering barge that will be used to fuel ships at sea. On Thursday, the tug Nickelena brought a barge over to BBC Philippines for offloading the tanks. The LNG tanks were manufactured at Alcotmi Inc., a prominent Canadian industrial manufacturer that designs and fabricates large-scale industrial pressure vessels, chemical tanks, and atmospheric equipment. BBC Philippines is 482′ x 75,’ built in 2023, and sailing under the flag of Antigua and Barbuda. This is her first visit to the Great Lakes/Seaway system.

Rosann Hollinger

 

Tug Nickelena alongside BBC Philippines. [Rosann Hollinger]

Great Lakes Marine Mart Coming Up October 24

This is a great chance to buy, sell or trade Great Lakes items including photos, books, models, artifacts and much more. See the attached poster for details.

Screenshot

Lift Bridge Lowers Too Soon, Damages American Courage

CLEVELAND, OH – On Sunday night, the Columbus Road Lift bridge over the Cuyahoga River came into contact with the forward mast of the self-unloading laker American Courage, bending it forward. Although nothing official has been released, it appears from video that the bridge deck was lowered onto the vessel prematurely. The Courage, which is running ore shuttles up the river, was backing under the bridge after departing the Cleveland Bulk Terminal.

Video of the incident as it happened, shot by Luis Mercado, who was in a vehicle on the bridge at the time. Warning: Profanity. View it here:

American Courage’s damaged mast. [Chuck Slusarczyk Jr.]

American Courage’s damaged mast. [Chuck Slusarczyk Jr.]

New Lock at the Soo Project Reaches 50% Completion in Phase 3

Tall cranes are part of th New Lock at the Soo Project. [Roger LeLievre

SAULT STE. MARIE, MI – The U.S. Army Corps of Engineers, Detroit District, announced a major milestone in the construction of the New Lock at the Soo, with Phase 3 of the project reaching 50 per cent complete. The Corps of Engineers awarded the base contract July 1, 2022, to Kokosing Alberici Traylor (KAT) LLC, of Westerville, Ohio. The new lock, a $3.219-billion investment in Great Lakes infrastructure, increases resiliency at the Soo Locks facility by constructing a second Poe-sized lock. Currently, 88% of all U.S. domestic iron ore transport is dependent on the 1969-era Poe Lock.

Reaching the halfway point on this mega project is a testament to the dedication of the Corps of Engineers team and the joint-venture contractor Kokosing Alberici Traylor LLC,” said Corps of Engineers Integrated Project Office Chief Mick Awbrey. “The progress made here is a direct reflection of the more than 600 people working on this project. They come to work every day committed to the successful completion of the new lock.”

Work on Phase 3 includes, but is not limited to, constructing a cofferdam at each end of the lock, demolishing the existing Sabin Lock, filling in the existing Davis Lock, excavating bedrock, constructing the New Lock chamber walls and floor, fabrication and installation of miter gates, installation of mechanical and electrical systems, installation of an innovative hands-free mooring system, rehabilitating the downstream approach walls and constructing a new pump well.

To date, KAT has completed $975 million worth of work through the end of August 2026. The current focus is on mass concrete placement for the concrete walls, the lock floor and new pump well construction. Offsite fabrication of the steel structures, including the miter gates, ship arrestors and culvert valves are also in progress.

It will take approximately 400,000 cubic yards of concrete to complete the New Lock at the Soo.

“If you were to build an average sidewalk that you see in a neighborhood, with 400,000 cubic yards of concrete, you could build a sidewalk from Sault Ste. Marie, Mich., to Orlando, Fla.,” Awbrey said. “It’s a massive amount of concrete, and we are making progress every day.”

The total quantity of concrete placed through August is 140,198 cubic yards, extending almost to Dayton, Ohio, on the ‘sidewalk to Orlando.’

Despite the harsh conditions of Michigan’s Upper Peninsula, the project remains on schedule for its 2030 target completion. The project is a flagship example of the Army Civil Works’ Building Infrastructure, Not Paperwork’ initiative, which prioritizes speed of execution, smart risk-taking, and mission-focused results. By streamlining processes and empowering decision-makers at every level of the vertical chain, the Corps of Engineers is delivering critical infrastructure for the nation faster and at less cost.

The New Lock at the Soo is one of the highest-priority commercial navigation projects in the United States. Its completion will ensure the reliable passage of raw materials crucial for American steel production, protecting thousands of jobs and reinforcing the domestic supply chain for decades to come.

The Detroit District oversees 3,150 miles of shoreline and 81 harbors and channels across Michigan and parts of Indiana, Wisconsin, and Minnesota, ensuring the Great Lakes remain a vital resource for the nation.

SooLeader

On This Day

  • 1860 WABASH VALLEY (wooden propeller, 592 tons, built in 1856, at Buffalo, New York) was caught in a blizzard and gale off Muskegon, Michigan, on Lake Michigan. Her skipper thought they were off Grand Haven and as he steamed to the harbor, visibility dropped to near zero. The vessel ran onto the beach. Her momentum and the large storm waves carried her well up onto the beach where she broke in two. Her machinery was salvaged and went into the new steamer SUNBEAM. CIRCASSIAN (wooden schooner, 135 foot, 366 tons, built in 1856, at Irving, New York) was carrying grain…

Read More

Noteworthy Passages

American Patriot Drydocked at Erie

The 245-foot-long cruise ship American Patriot, owned by American Cruise Lines and new to the lakes in 2026, has gone on the drydock at DonJon Shipbuilding and Repair at Erie, PA. It is unknown whether she will winter there.

read more

Boatnerd Gatherings

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.