CCGS Griffon
CCGS Griffon was built in 1970 by Davie Shipbuilding in Lauzon, Quebec, entering service as the last of of the first group of diesel-electric vessels in the Canadian Coast Guard.
Officially classified as a “high-endurance multi-tasked vessel,” the Griffon performs icebreaking duties in the winter months, primarily in eastern Lake Ontario and along the Seaway down to Montreal, and serves as a buoy tender and search & rescue vessel in the warmer months.
Vessel Details
IMO No.
7022887
Year Built
1970
Builder
Davie Shipbuilding (Lauzon, Quebec, Canada)
Length
233'11" (71.3m)
Beam
48'11" (14.9m)
Depth
15'5" (4.7m)
Class/Mission
High-Endurance Multi-Tasked Vessel, Light Icebreaker
Homeport
CCG Base Prescott (Prescott, ON)
Gross Tonnage
2,212 tons
Engine Power
5,343 bhp diesel-electric
Previous Names
(none)
Previous Fleets
(none)

CCGS Griffon hunts for the unidentified object on Lake Huron, as seen from a Coast Guard helicopter. Canadian Coast Guard image, February 14

The tug boat Adanac III meeting the CCGS Griffon while they were ice breaking for the American Mariner in the upper St Mary’s river. March 26, 2022. Mike Mishler.

CCGS Griffon, sunrise view, ice breaking operations on the St. Clair River. March 4, 2022. Rod Burdick.

CCG Cutter Griffon departing Amherstburg, ON to assist Algonova up the Detroit and St. Clair Rivers to Sarnia. Feb. 8, 2022. Dave Cozens.

CCGS Griffon leading tanker Iver Bright down an ice filled St. Clair River on a gray winter morning and after a winter storm. Feb. 3, 2022. Rod Burdick.

CCGS Griffon giving ice escort for Bradshaw McKee at Sarnia or Marysville. Jan. 21, 2022. Lorraine Morrill.


![CGG GRIFFON - Downbound Port Huron, Michigan 1-24-2025 [Paul R Murray] [3]](https://www.boatnerd.com/wp-content/uploads/cache/2025/01/CGG-GRIFFON-Downbound-Port-Huron-Michigan-1-24-2025-Paul-R-Murray-3/4036433186.png)
![CGG GRIFFON - Downbound Port Huron, Michigan 1-24-2025 [Paul R Murray] [2]](https://www.boatnerd.com/wp-content/uploads/cache/2025/01/CGG-GRIFFON-Downbound-Port-Huron-Michigan-1-24-2025-Paul-R-Murray-2/3008268552.png)
![CGG GRIFFON - Downbound Port Huron, Michigan 1-24-2025 [Paul R Murray] [1]](https://www.boatnerd.com/wp-content/uploads/cache/2025/01/CGG-GRIFFON-Downbound-Port-Huron-Michigan-1-24-2025-Paul-R-Murray-1/3401567112.png)
![CCG GRIFFON - Downbound Port Huron, Michigan 1-9-2025 [Paul R Murray] [3]](https://www.boatnerd.com/wp-content/uploads/cache/2025/01/CCG-GRIFFON-Downbound-Port-Huron-Michigan-1-9-2025-Paul-R-Murray-3/2114720842.png)
![CCG GRIFFON - Downbound Port Huron, Michigan 1-9-2025 [Paul R Murray] [2]](https://www.boatnerd.com/wp-content/uploads/cache/2025/01/CCG-GRIFFON-Downbound-Port-Huron-Michigan-1-9-2025-Paul-R-Murray-2/1622915360.png)
![CCG GRIFFON - Downbound Port Huron, Michigan 1-9-2025 [Paul R Murray] [1]](https://www.boatnerd.com/wp-content/uploads/cache/2025/01/CCG-GRIFFON-Downbound-Port-Huron-Michigan-1-9-2025-Paul-R-Murray-1/4164351263.png)

![CCGS Griffon [Scott Suisse] 3-16-2024](https://www.boatnerd.com/wp-content/uploads/cache/2024/03/CCGS-Griffon-Scott-Suisse-3-16-2024/694052793.png)
![CCGS Griffion [Brad Wood] 1-6-2024](https://www.boatnerd.com/wp-content/uploads/cache/2024/01/CCGS-Griffion-Brad-Wood-1-6-2024/4173992833.png)











